You are here:

Client:
FOR Industry Engineering

Project:

Shotton Mill Papper-Construction: Installation of approximately 23 km of piping with diameters ranging from 6 mm to 42 mm (pneumatics, hydraulics, oil lubrication, grease lubrication, and water) on level 0 and 8.5. And the installation of process piping at elevation 16.5 m as well as in the Starch building.

Role:
Health and Safety Consultant

Location:
Deeside, Wales

ENQUIRE NOW